Freud would have a field day with me.
Albacore 4862 is a 1973 Skene, built for my late father. He had Skene install the racing deck during the mid '70s. This was somewhat of a custom project, since Skene had changed the hull mold in the interim, and the deck mold was designed for the new hull mold. This is the boat I learned to sail and race on, crewing and then steering for my father. My father was forever experimenting with new control system ideas and implementing them with cheap or homemade fittings. For example, he had the first pre-bender on an Albacore (we were protested for having it at the 1973 North Americans, but won the protest by pointing out that if you allowed mast rams, how could you not allow a bender), and it was one of the first boats I remember having a transom bridle and vang sheeting. However good were some of the ideas, the implementation left some things to be desired. I was frequently annoyed racing the boat when systems would break or stop working, and I promised myself that when I had my own boat, it would be properly rigged.
The boat was stored upside down outdoors for almost ten years after my father's death, and then converted to cottage use by removing virtually all the control systems. I saw the boat at my Uncle's cottage, decided it deserved better, and brought it home with me. My initial work was directed towards making the boat sailable and raceable again, by restoring some - but not all - of the control systems; I was unable to replicate my father's transom bridle system that had an adjustable height and adjustable off-center gybe capability. This was primarily accomplished by rigging them with high quality fittings so that they worked reliably. I purchased a Waterat CB, a stiffer boom, replaced the blocks with decent ball bearing blocks, bought some JC sails and went racing. For the first time ever, the control systems actually worked! However, the boat felt awful! It was like sailing a rubber Albacore; everything moved or vibrated as the boat went through the water, and it could not carry any rig tension. Based on my experience in 505s I decided that the boat would do better with some structure inside it, even if this meant carrying the extra weight around, and it also needed up-to-date Albacore control systems.
To go back to the why: This is probably mostly between my father and I. I hope he approves.
Any Albacore that does not already have diagonal bulkheads could be a candidate for a similar effort. A Skene or Ontario Yachts Albacore newer than 4862 may benefit from a smaller scale effort. And would not need all the work that was done to 4862.
Tube (compression) and wire (tension) structures could in theory handle much of the load, but I thought they would be difficult to install. In particular the bow tank would be in the way of a tension member from the bow fitting to the mast step. Also the earlier system of aluminum tubes had simply been glass taped in, and had been quite unsuccessful. I therefore chose to build bulkheads, selecting full height diagonal bulkheads that went from the shroud chainplates to where they met on centerline, just forward of the mast gate, a centerline bulkhead going from the centerline just forward of the mast gate to the bow (over the bow tank), and a large box thwart just aft of the CB handle when the CB was in the full down position.
Several construction alternatives were considered including plywood/epoxy, plywood/ glass/epoxy, and glass/foam/epoxy or glass/honeycomb/epoxy bulkheads. After going back and forth on this for awhile, I decided on foam/glass/epoxy. Since I was unwilling to seriously contemplate vacuum bagging, I turned to a boatbuilder - Larry Tuttle at Waterat Sailing Equipment - to make the bulkheads based on the templates I made. Larry suggested that aircraft plywood/epoxy would be better than the glass/foam/epoxy, and was able to provide unfinished plywood bulkheads based on paper versions of my templates. I was working in a townhouse one car garage and had limited tools, so it was easier to have the builder make these parts for me.
Larry Tuttle also recommended taping in the bulkheads with two layers of seven ounce tape on either side of the bulkhead, when glassing them in, and provide a great deal of useful information on many aspects of the rebuild.
I also had to prepare portions of the boat to have structure bonded in to them, which involved grinding through the gelcoat into glass cloth in these areas. I spent a total of approximately 15 hours grinding out the interior of the boat, including portions of the underside of the foredeck (where I would bond in the centerline frame), the top of the bow tank (centerline), the floor, transom, and portions of the sides above the seat tanks that I could reach with a large grinder. The stringers in the boat were ground out from the mast step back to where the front face of the thwart would be. This job required a Tyvec suit, dust mask and goggles, and was the most uncomfortable task due to the itching caused by fiberglass dust.
The centerline bulkhead was the first to be bonded in. This was a challenge, as I had to keep it straight while taping it in (I temporarily screwed a stiffener to it) and avoid deforming the bow tank while I was lying on it taping in the bottom of the centerline bulkhead. I then had to turn the boat upside down to tape the top of the centerline bulkhead to the deck. I then flipped the boat back upright, removed the temporary stiffener, and filled the screw holes where it had been attached.
I next bonded in the mast step, which was essentially a continuation of the centerline bulkhead though made of slightly thicker plywood. All parts with the exception of the centerline bulkhead were (tk) thick, while the centerline bulkhead, which was in the bow, was only (tk) thick to save a little weight in the ends.
The mast step was reinforced with sitka spruce blocks, with the grain aligned vertically.
These were "sandwiched" around the centerline bulkhead to mast step butt join, with a layer of fiberglass cloth in between the sitka and the centerline bulkhead/step, on either side.
The centerline bulkhead had a sitka spruce strip on either side of the back edge, to bond the diagonal bulkheads to. Since the centerline bulkhead was fully taped in - and had to be as there would be no access once the diagonals were bonded in - the deck and floor were now tied together, and the boat was much less flexible, making fitting the diagonal bulkheads quite a challenge.
With a little more fitting and some judicious use of brute force,
one and then the other diagonal bulkheads were positioned in place and taped in to the floor, and to the back of the deck. The boat was then flipped upside down again, and the diagonal bulkheads taped to the underside of the deck. The diagonals were taped to each other using wider tape which strengthening the vertical join just in front of where the mast would be.
The boat was then raised on sawhorses. Plumb bobs were dropped from the bow and stern, the boat was levelled at the shrouds and bow (fortunately they matched) and a centerline marked on the garage floor. The centerboard was pulled part way down, and forced onto the centerline (it was significantly off), and a temporary thwart to keep the CB cap/trunk on centerline was installed.
The boat was lowered, and
the fore and aft thwart faces were taped in
Then
sitka spruce reinforcements were bonded to the inside top edges of the thwart faces, to support the thwart tops.
At this point, I was going sailing out of the country for a month, and elected to drop both the Albacore and my 505 off with a boatbuilder for some work and maintenance respectively. My 505 was having its woodwork refinished, and it seemed easy enough to have the builder do the wood already installed in the Albacore at the same time. I also had the builder vacuum bag some foam core to the floor of the boat, between the diagonal bulkheads and the forward thwart face. This cored area was primarily to reinforce the hull to withstand the sideways loads from the CB at the bottom of the CB trunk, but had the added benefit of very significantly stiffening the floor of the boat in this area. Both boats returned in good shape. The Albacore had the wood already installed clear coated with Interthane Plus, a two part linear polyurethane, and the interior of the boat painted with Interlux one part polyurethane, with a non skid finish on the floor.
I then bonded in the thwart extension faces. These extend the thwart from the inner edge of the seat tank, up to the side decks. Taping the tops to the underside of the side decks required the boat to be flipped upside down again. I also bonded in sitka spruce reinforcements to support the bonding in of the thwart extension tops.
The design supports four control lines led to either side, with the control line emerging through a slot in the thwart top face, and going from there to a slot in the thwart extension. The control lines are then turned aft under the side decks, for shockcord takeups. Two control lines come to the thwart from forward of the thwart and two come from aft of the thwart. This would allow me to lead jib halyard and shrouds from aft, and vang and one of mast ram, mast pre-bend, cunningham or outhaul from forward of the thwart. Completing the thwart and thwart extensions The cleats and turning blocks were then installed on the cleat trays, and the cleat trays temporarily installed in the thwarts. The thwart tops and thwart extension tops were fitted and where the slots for the control lines should be was determined. This was done by running whipping twine through the cleats and blocks, tensioning them and measuring where they intersected the planes of the thwart tops and thwart extension tops. Since I was concerned about the strength and stiffness of the thwart tops with long slots cut in them, I glassed the inside faces of the thwart tops (the only portions of the bulkheads so reinforced), and put a further reinforcement of 2" glass tape from front to back of each thwart top, just outboard of where the slots would end. The thwart and thwart extension tops then had the slots cut in them and epoxy sealed. The cleat trays were then removed, and the thwart tops and then thwart extension tops bonded and glass taped in. The edges were rounded with a router, and glass taped. The glass tape was sanded flush with the top surfaces of the thwart and thwart extensions (so the crew could slide on the thwart without catching on an edge).
After the Interthane Plus coating had cured, I masked off around the wood, and primed and painted the ground out areas around where each wooden piece had been bonded in. One could prime and paint the entire boat, for a consistent appearance, but this would add more weight. Actually, some portions of the boat: the floor, and the areas that would be enclosed by the thwart and the thwart extensions, had to be painted before the thwart tops and thwart extension tops were bonded in.
That concluded the construction phase of the project. All that remained was rigging the boat.
The vang and the jib halyard are led to each side. Eventually adjustable shrouds will be rigged to each side, and the fourth position on each thwart will be left for future use. The outhaul and cunningham are led to the CB cap just aft of the mainsheet swivel. The centerboard up line is a 3:1 led aft along the top of the CB trunk to the thwart and turned to starboard (for use when bearing off on a port rounding at a windward mark) along the aft edge of the thwart. The line continues aft, crosses the boat, and goes forward to the port side of the thwart, where it becomes a 2:1 CB down control.
The rigging is not currently - November 9, 1998 - complete. The shockcord takeups for the vang, jib halyard and centerboard lines have not been rigged. Though the mast ram track, car and strut are rigged, no control lines are yet. The centerboard trunk upper opening varies in width, and the CB jams at both the full up and full down position. A fair bit of work remains to complete the boat, but it was complete enough to race the last race of the 1998 season, the PRSA Fall Frostbite. The last time the boat was in the water was the PRSA Fall Frostbite two years ago, which the boat won. After two years of rebuilding, the boat was able to win (narrowly) the Fall Frostbite again. It was over 2000 numbers older than the second oldest boat racing.
I have not yet weighed the boat. The last time it was weighed, some time before the rebuild, it was close to minimum weight.
I would make the bulkhead and thwart out of foam/glass/epoxy to avoid the epoxy coating and clear finishing steps required for the wooden parts. However, foam/glass/epoxy bulkheads might be so stiff that you would not be able to bend the diagonal bulkheads when forcing them into place. You might consider taking the deck off to allow easier access into the hull to build in bulkheads.
If you do choose aircraft plywood, the two faces are slightly different. One is a darker mahogany, the other lighter. If you want each visible face (with the exception of the mast step each piece is only seen on one face) to be the darker - I like it better - face, you would have to lay out the panels that way. This may require slightly more plywood.
Use a maximum CB trunk width shim, the full length of the CB trunk, while fitting and bonding in reinforcements. The trunk was not consistent width before I started, but the boat was flexible enough that the board could go up and down (with a little forcible encouragement). The structure now prevents the CB cap from bending, and restricts the movement of the centerboard. I have to sand the CB cap to open the CB cap opening up to a consistent - and class maximum - width. I did use an old centerboard as a shim, but it was not maximum width.
Remember that you are fixing up an old beat up Albacore, and are not trying to build a piece of furniture (not that I could have, but I could have worked a lot faster).
Consider moving the three way join between the diagonal bulkheads and the forward centerline bulkhead an inch or two further forward to allow the mast to be stepped at the maximum class allowable distance forward, and to allow for a maximum length mast gate. However, this will require the diagonal bulkheads to go in at an angle that does not match the aft edge of the Skene racing deck, so the top of the bulkhead will have to be fastened to the inside surface of the foredeck some other way that what I was able to do. My design has the bulkhead flush with the inside surface of the lip on the back of the foredeck.
Don't spend hours staring at the boat at various stages in construction, imaging it completed (a couple of minutes is good).